VITAL INFORMATION
Assembly instructions for multi-enclosure batteries:
Setpoints for voltage-based setup:
For installations that exclude serial/CAN communication, set the following values:
|
|
13V |
26V |
39V |
52V |
|
V(high set) / Bulk / Absorb |
14.1V |
28.1V |
42.1V |
56.2V |
|
V(float) |
13.9V |
27.8V |
41.6V |
55.5V |
|
V(reconnect) |
12.8V |
25.6V |
38.4V |
51.2V |
|
V(low set) |
12.3V |
24.5V |
36.8V |
49V |
IMPORTANT: To ensure that your battery remains in optimum operating condition, charge the battery at least every 3rd day to 100% state-of-charge and verify that each cell’s voltage is between 3.5V ~ 3.65V.
Connecting batteries in parallel:
Support:
For any technical assistance, please log a ticket on our support system.
https://www.bluenova.co.za/contact-us/support/
Supporting materials:
Supporting documents, latest firmware, and manuals can be found on our website under the knowledge base: https://desk.zoho.com/portal/bluenova/home
|
Following installation, please complete the Online Product Registration Form. This can be found online at: https://www.bluenova.co.za/product-registration/ |
Contact information:
BlueNova Technical Support +27(0)21 205 2000 / support@bluenova.co.za
We value your feedback! For suggestions on how we can improve our products and services, please email BlueNova Customer Care at enquiries@bluenova.co.za